Case Studies

Engineering outcomes, documented.

Hyperscale · Northern Virginia

100 MW chilled water plant retrofit for GPU training

Challenge

Existing chilled water plant designed for 15 kW/rack could not absorb a new 75 kW/rack GPU cluster.

Solution

Staged rear-door HX retrofit with condenser water reset, plant sequencing rewrite, and live-load commissioning.

18%
kW/ton reduction
75 kW
Rack density
0
Downtime minutes
2.4 → 1.32
PUE shift

Colocation · Dallas

Multi-tenant hall containment + airflow rebalance

Challenge

Recurring hot spots and customer SLA escalations across two open-aisle suites.

Solution

CFD-informed cold aisle containment with perforated tile reconfiguration and 2°F supply temperature lift.

22%
Stranded capacity recovered
0
Customer escalations (90d)
+2°F
Setpoint lift

Enterprise · Financial Services

24/7 PM program across three data halls

Challenge

Aging Liebert and Stulz fleet without consistent maintenance documentation.

Solution

OEM-aligned PM program with vibration analysis, BMS trending and quarterly executive reporting.

0
Unplanned outages (12mo)
100%
OEM warranty preservation