Hyperscale · Northern Virginia
100 MW chilled water plant retrofit for GPU training
Challenge
Existing chilled water plant designed for 15 kW/rack could not absorb a new 75 kW/rack GPU cluster.
Solution
Staged rear-door HX retrofit with condenser water reset, plant sequencing rewrite, and live-load commissioning.
- 18%
- kW/ton reduction
- 75 kW
- Rack density
- 0
- Downtime minutes
- 2.4 → 1.32
- PUE shift